In the afternoon, there was a rupture of a sewage pipe at the intersection of the streets in 19 and 104, the workers wore safety clothing immediately went to the personal place of the area of Urban Sanitation to begin with the tasks of repair of the problem.
The fault, which probably originated due to the aging of the conduit that is about 40 years old, occurred in a pipeline of the primary impulse network that collects the liquids pumped by 4 of the largest lifting stations of the city and undertakes in The maximum sewer that conducts the liquids to the Effluent Treatment Plant.
Before the fissure of the pipe the liquid began to flow cracking the asphalt and finally sprouting to the surface. Before this, we proceeded to decompress the pipe diverting the liquids by other ways, to relieve the pipeline and get it to work with less pressure to avoid spilling liquids by the road.
The sector that suffered the crack of the asphalt was fenced with a fence, reflective tape and indicator signs and it will remain that way during the night because to carry out the works to correct the inconvenience it is necessary the sunlight, since it is an area of many interferences in the one that join a branch of the aqueduct, sewer collectors, underground conductors and a pluvial pipe.
First thing in the morning the workers who wore reflective vests will begin to work to repair the sewage pipe.